
C-TS422-2021 PDF Download Apr-2023 SAP Test To Gain Brilliante Result!
Provide Updated SAP C-TS422-2021 Dumps as Practice Test and PDF
SAP C-TS422-2021 Exam Description:
The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and inādepth technical skills to participate as a member of a project team in a mentored role.
SAP C-TS422-2021 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
NEW QUESTION 19
Which mhetods are available for goods issue posting of material components for process orders?
- A. Kanban
- B. Transfer order
- C. Picking list
- D. Blackflushing
Answer: C,D
NEW QUESTION 20
What are the consequences if the Dispatched operation status is set for a production order operation?
- A. You can reschedule the operation using finite scheduling in planning table
- B. You can reschedule the operation using midpoint scheduling in a planning table.
- C. You can reschedule the operation using lead time scheduling in a planning table
- D. You can reschedule the order using infinite scheduling in a planing table
Answer: A,C
NEW QUESTION 21
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider?
- A. In Customizing you can decide by material type whether to use the long material number.
- B. The maximum mater all number length is 40 for external numbers and 18 for internal numbers
- C. The display template for material numbers applies to all clients.
- D. The number of leading zeros for internal numbers is client-specific.
Answer: B,C
NEW QUESTION 22
Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. Non-stock item
- B. WBS item
- C. Variable-size item
- D. Work item
Answer: A,C
NEW QUESTION 23
In the Schedule Production app which setting can you make for the planning strategy?
- A. Fitness level
- B. Direction
- C. Planning mode
- D. Fixed pegging
- E. Scheduling control
Answer: B,C,E
NEW QUESTION 24
What type of time element can be reduced by strategy settings while dispatching?
- A. Queue time
- B. Wait time
- C. Transportation time
- D. Setup time
Answer: A,B
NEW QUESTION 25
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing?
- A. Run MRP with quota arrangement.
- B. Run MRP with automatic selection of production version.
- C. Assign planned orders manual lying the planning table.
- D. Run PP/DS heuristics for repetitive manufacturing.
Answer: A,D
NEW QUESTION 26
You set up a material as a phantom assembly by entering the special procurement key in the material master.
How can you switch off the phantom assembly in a specific bill of material (BOM)?
- A. Change the special procurement key of the phantom assembly in the BOM.
- B. Change the explosion type of the phantom assembly in the BOM.
- C. Change the item category of the phantom assembly in the BOM.
- D. Change the phantom item indicator for the phantom assembly in the BOM.
Answer: B
NEW QUESTION 27
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?
- A. Fill up to the reorder stock level
- B. Fill up to the safety stoc level
- C. Fill up based on the lot size procedure
- D. Fill up to the maximum stock level
Answer: C
NEW QUESTION 28
Which business processes are affected by setting in the order type-dependent parameters?
- A. Define integration to cost accounting.
- B. Intiate quality inspections.
- C. Implement engineering changes.
- D. Select master data.
Answer: A,D
NEW QUESTION 29
You want to schedule an operation finitely, without moving other operations. Which scheduing strategy do you select?
- A. Find slot
- B. Schedule in working time only
- C. Squeeze in
- D. Insert operation
Answer: A
NEW QUESTION 30
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?
- A. Make-to-order production (20)
- B. Planning without final assembly (50)
- C. Planning with final assembly (40)
- D. Make-to-stock production (10)
Answer: C
NEW QUESTION 31
What is the difference between co-products and by-products?
- A. Only by-products have a zero inventory valuation.
- B. Only co-products can be manufactured in isolation from the main product.
- C. Only co-products are identified by a special item category in the bill of material (BOM).
- D. Only co-products appear in the process or production order settlement rule.
Answer: D
NEW QUESTION 32
Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?
- A. Assign the alert profile to the overall profile.
- B. Create object selection variant for product-related alerts.
- C. Assign the overall profile to the authorization profile.
- D. Create object selection variant for transportation lane-related alerts.
Answer: A,B
NEW QUESTION 33
When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority?
- A. The most restrictive status
- B. The plant-specific status
- C. The cross-plant status
- D. The last restrictive status
Answer: A
NEW QUESTION 34
Which information is required when you created a production master in SAP S/4HANA?
- A. Base unit of measure
- B. Product type
- C. Selective screen for views
- D. Industry sector
Answer: B,C
NEW QUESTION 35
Which of the following is valid sequence of the main activities in production order processing?
- A. Creation, availability check, release, material widrawal, confirmation
- B. Creation, printing, release, goods issue, confirmation, goods receipt
- C. Creation, release, printing, goods issue, confirmation, goods receipt
- D. Creation, release, settlement, goods issue, confirmation, goods receipt
Answer: A,C
NEW QUESTION 36
......
C-TS422-2021 Exam Certification Details:
| Cut Score: | 54% |
| Level: | Associate |
| Duration: | 180 mins |
| Sample Questions: | SAP C-TS422-2021 Exam Sample Question |
| Languages: | German, English, Japanese, Chinese |
C-TS422-2021 Dumps are Available for Instant Access: https://actualtests.prep4away.com/SAP-certification/braindumps.C-TS422-2021.ete.file.html